Cavity Trays Type X Long Lead 23.5 Pitch Intermediate Tray - 270mm (Left Hand & Right Hand)

From£15.78 ex VAT£18.94 inc VAT

Notify meCheckout

Item has been added to your basket

Select options to see a delivery estimate
Delivery estimate In Stock
See delivery terms for this product
Collections are not available
Select options to see a delivery estimate
Delivery estimate In Stock
See delivery terms for this product
Collections are not available
Product info

The Type X Long Lead 23.5 Pitch Intermediate Tray from Cavity Trays is the only high performance classified cavitray for gable abutments and comes in Left and Right Hand options. Great for new-build applications, each tray has an end upstand so water can only discharge via the open end of the tray. This product provides you with many advantages in new-build roofing projects and is designed to be built into each course up the rake of the roof. They are able to be used in both traditional and timber frame constructions where the course size is 75mm (standard brickwork coursing).

Made from preformed DPC with an attached ready-shaped flashing, when laid in every course of a cavity wall external skin, against which a sloping roof abuts, Type X trays provide continuous stepped DPC protection running parallel with the slope. Any water and dampness in the exposed masonry skin above this stepped arrangement is prevented from gravitating in a downwards direction below it. Therefore, the masonry skin is wet above the roofline but remains dry where it becomes an internal wall. Trays come handed and, as you view the gable, the left hand trays discharge to the left and the right-hand trays discharge to the right. 

Installation: The moulded features on every tray support fast and accurate positioning. The mason is required to set up a chalk line matching the roof pitch and build one tray into every course with its corner on the line. This simplified installation procedure ensures all trays align and are correctly distanced. For further information, please see our Technical Information section. 

  • Size: 270mm x 210mm x 150mm
  • 2 options: Left Hand & Right Hand
  • Solid DPC petheleyne, AA
  • Lead flashing BS EN 12588
  • Specify pitch, lead length, handing and whether external skin is brickwork. Water drip bars eliminate underbase track-back
  • Correct mortar bedding depth is also established as bar dimensions harmonise with front of tray section to aid stability and mortar integrity
  • Integral cavitray sealing flap links with upper tray
  • Feature on the tray end upstand arrests horizontal tracking at this vulnerable point

Non-standard preformed cavity trays are available, Cavity Trays can design and manufacture bespoke requirements. Non-standard trays maybe required in areas of buildings where complicated junctions are encountered. Please contact Roof Giant with your drawings and quantity required.

What you need to know

Delivery charges

  • The delivery charge will be shown in the checkout.
  • If the delivery is missed for any reason, you will be billed again for the re-delivery. See below: failed deliveries.

Delivery access

  • Cavity Trays products are either delivered on third party couriers who deliver on 7.5T or 12T rigid vehicles. Deliveries to nearest accessible point no more than 10 metres from the vehicle. 
  • Our sales office will need to be made aware of any delivery restrictions, such as narrow lanes, overhanging trees etc. that may cause restrictions.

Date and time of delivery

  • We will advise a delivery date to you by email and your order will be delivered directly to you from Cavity Trays.  
  • Delivery will arrive between 8.30am–5pm Monday to Friday. 

Failed deliveries are chargeable

  • You must be present to accept and sign for the delivery.
  • If it fails delivery will automatically be put down for re-delivery the following working day. 

Damages & missing items

  • All damaged or missing items should be reported to the driver and signed for as damaged or missing, wherever possible.
  • Contact Roof Giant within 3 days with all details so we can help you. If you wait too long, we may be unable to help.
  • Any damages must be photographed as delivered and submitted along with your claim by email to sales@roofgiant.com.

Do not install purchased items if you have a query with the product (e.g. if you need to query damage that occurred during transit).

  • If an item is installed it will not be refunded or replaced. 

Roof Giant delivery Q&A

Delivery

How much does delivery cost?

Delivery charges will vary and will depend on the manufacturer, weight, size and delivery location. The cost is automatically calculated when you add items to the shopping basket.

How long will I wait for my delivery?

The estimated delivery times are shown on each product page, we will email you each step of the way to keep you informed. The majority of products can be delivered within 3-5 working days.We will advise you if the delivery period is different from than stated on our website.

What if my delivery doesn't turn up on time?

Please contact our sales office on 01858 455055 or email sales@roofgiant.com and we will advise on the status of your order.

Do you offer free delivery if I spend a substantial amount?

Not as standard, we show the delivery charges separate once you go to the checkout so it is clear what you are paying for the products and delivery costs. If you are ordering larger quantities please contact out sales team who will be able to confirm if this is possible.

Do you deliver on weekends?

Not as standard, our deliveries are made Monday to Friday. If you do need an urgent Saturday delivery please contact out sales team on 01858 455055 during office hours who will be able to confirm. This will incur a premium charge if possible.

Do you deliver to Northern Ireland/Guernsey/The Scottish Highlands/Isle of Wight?

We cannot deliver any goods to Northern Ireland due to supplier restrictions.

Some suppliers/couriers will deliver to the other areas listed above, but not all - please contact our sales team  for confirmation. If we are able to deliver the product you require, additional transport costs will apply. These additional costs are based on the manufacturer, distributor or courier providing the shipping on our behalf.

Do you deliver to Republic of Ireland, Europe and Rest of World? 

No, we cannot deliver outside of Great Britain.

What if my delivery doesn't turn up on time?

Please contact our sales office on 01858 455055 or email sales@roofgiant.com and we will advise on the status of your order.

Returns Policy

Important: Please do not return goods without first contacting our Sales Office and receiving return instructions.
📞 01858 455055 | ✉️ sales@roofgiant.com | 💬 Live chat

Please take photographs of the goods and packaging before returning. These may be required to support a return or courier claim.

Your Right to Cancel

  • Under the Consumer Contracts Regulations 2013, consumers generally have 14 days from receiving their goods (or the final item of a split delivery) to cancel an online order.
  • You must notify us within this period by phone, email or live chat.
  • Goods must be returned within the required timeframe. You are responsible for the direct cost of returning unwanted goods unless otherwise agreed.

Refunds

  • We will refund the product price you paid.
  • Refunds will be processed within 14 days, subject to the goods being returned or evidence of return being provided.
  • We may deduct an amount to reflect any reduction in value caused by handling beyond what is reasonably necessary to inspect the goods.

Exclusions & Brand Policies

  • Certain products may be excluded from cancellation or subject to specific return conditions, including made-to-order, cut-to-size or customised products.
  • Some brands and products may also have specific supplier return requirements, including VELUX, Castle Composites and Midland Lead.
  • Nothing in this policy affects your statutory rights, including your rights relating to faulty, damaged or incorrectly supplied goods.

👉 For full details, including supplier-specific terms, please see our Returns & Refund Policy.

Reviews