The Type X Long Lead 35 Pitch Catchment Tray by Cavity Trays is similar to an intermediate tray but has upstands to both ends and works to receive water from the intermediate trays and discharge this collected water through a Caviweep supplied with the tray. Type X Cavitrays are the only high performance cavitray for gable abutments, offering you many benefits in new-build roofing applications. They are suitable for use in both traditional and timber frame constructions where the course size is 75mm (standard brickwork coursing).
Made from preformed DPC with an attached ready-shaped flashing, when laid in every course of a cavity wall external skin, against which a sloping roof abuts, Type X trays provide continuous stepped DPC protection running parallel with the slope. Any water and dampness in the exposed masonry skin above this stepped arrangement is prevented from gravitating in a downwards direction below it. Therefore, the masonry skin is wet above the roofline but remains dry where it becomes an internal wall. Trays come handed and, as you view the gable, the left hand trays discharge to the left and the right-hand trays discharge to the right.
Installation: The moulded features on every tray support fast and accurate positioning. The mason is required to set up a chalk line matching the roof pitch and build one tray into every course with its corner on the line. This simplified installation procedure ensures all trays align and are correctly distanced. For further information, please see our Technical Information section.
Non-standard preformed cavity trays are available, Cavity Trays can design and manufacture bespoke requirements. Non-standard trays maybe required in areas of buildings where complicated junctions are encountered. Please contact Roof Giant with your drawings and quantity required.
What you need to know
Delivery charges
Delivery access
Date and time of delivery
Failed deliveries are chargeable
Damages & missing items
Do not install purchased items if you have a query with the product (e.g. if you need to query damage that occurred during transit).
Delivery
How much does delivery cost?
Delivery charges will vary and will depend on the manufacturer, weight, size and delivery location. The cost is automatically calculated when you add items to the shopping basket.
How long will I wait for my delivery?
The estimated delivery times are shown on each product page, we will email you each step of the way to keep you informed. The majority of products can be delivered within 3-5 working days.We will advise you if the delivery period is different from than stated on our website.
What if my delivery doesn't turn up on time?
Please contact our sales office on 01858 455055 or email sales@roofgiant.com and we will advise on the status of your order.
Do you offer free delivery if I spend a substantial amount?
Not as standard, we show the delivery charges separate once you go to the checkout so it is clear what you are paying for the products and delivery costs. If you are ordering larger quantities please contact out sales team who will be able to confirm if this is possible.
Do you deliver on weekends?
Not as standard, our deliveries are made Monday to Friday. If you do need an urgent Saturday delivery please contact out sales team on 01858 455055 during office hours who will be able to confirm. This will incur a premium charge if possible.
Do you deliver to Northern Ireland/Guernsey/The Scottish Highlands/Isle of Wight?
We cannot deliver any goods to Northern Ireland due to supplier restrictions.
Some suppliers/couriers will deliver to the other areas listed above, but not all - please contact our sales team for confirmation. If we are able to deliver the product you require, additional transport costs will apply. These additional costs are based on the manufacturer, distributor or courier providing the shipping on our behalf.
Do you deliver to Republic of Ireland, Europe and Rest of World?
No, we cannot deliver outside of Great Britain.
What if my delivery doesn't turn up on time?
Please contact our sales office on 01858 455055 or email sales@roofgiant.com and we will advise on the status of your order.
Returns Policy
Important: Please do not return goods without first contacting our Sales Office and receiving return instructions.
📞 01858 455055 | ✉️ sales@roofgiant.com | 💬 Live chat
Please take photographs of the goods and packaging before returning. These may be required to support a return or courier claim.
Your Right to Cancel
Refunds
Exclusions & Brand Policies
👉 For full details, including supplier-specific terms, please see our Returns & Refund Policy.